2024 Solar Panel Government Grants

The government of Malta launched new grant schemes for 2024 to incentivise the use of renewable energy as part of the €4.8 million investment in renewable energy systems for households. Applications are open from Friday the 23rd  of February 2024

Option 1 – PV system with a standard inverter

Solar PV system with standard solar inverter – you will receive 50% of eligible costs up to a maximum of €2,500 per system and €625/kWp.

Option 2 – PV system with a hybrid inverter

PV system with hybrid inverter – you will receive 50% of eligible costs up to a maximum of €3,000 per system and €750/kWp.

Option 3 – PV system with a hybrid/battery inverter and battery

PV system with a hybrid/battery inverter and battery. You will receive 80% of the eligible costs of the battery storage up to a maximum of €7,200 per system. It also includes €720/kWh in addition to 80% of eligible costs of the hybrid inverter up to a maximum of €1,800 per system and €450/kWp.

Option 4 – PV system with battery storage

PV system with battery Storage only. You will receive 80% of eligible costs of the battery storage up to a maximum of €7,200 per system and €720/kWh.

Request a quote

Reach out to us today to initiate the process and commence enjoying greater savings on your energy systems.